Drag Link – Compatible with 1978 – 1993 Dodge Ramcharger 4WD 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992
Free U.S. shipping · Shipping details
Drag Link – Compatible with 1978 – 1993 Dodge Ramcharger 4WD
Features:
– Powdered metal gusher bearing design enables grease to flow through bearing
– Patented cover plate design allows for tighter tolerances vs traditional designs for a more durable part
– Exclusive cover plate protects against contaminants leaking into the bearing surface
– Full ball metal stud provides 360-degree; of smooth, consistent, rotational movement resulting in more responsive steering
Compatible With or Fits:
Note: Includes Greasable Socket Design to Reduce Corrosion and Wear
– 1978 – 1993 Dodge Ramcharger 4WD
Note:
– 1978 – 1993 Dodge Ramcharger 4WD
Fits Years: 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993
- Review Product Description to Ensure Proper Fit
- 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993
- Drag Link
Shipping
Standard shipping is free on every order to all 50 states.
Orders are processed within 1-2 business days before dispatch. Our order cutoff is 2:00 PM U.S. Central Time (CT, observing CST/CDT as applicable), Monday through Friday, excluding U.S. federal holidays.
Delivery typically takes 2-4 business days after dispatch to all 50 states, including Alaska and Hawaii. Transit estimates do not include processing time; delivery times are estimates, not guarantees.
Returns
Return eligible items within 30 days of delivery.
Condition: Items must be unused, in their original packaging, and in resalable condition.
Return Shipping and Fees: Return shipping is free. A prepaid return label ships with your order, and we do not charge restocking fees.
Dimensions & Specs
Product photos show scale and set contents — use them to judge sizes and counts before ordering. Need a measurement or piece count confirmed? Email support and we'll check the set for you.
Care Instructions
Store paper decorations flat in a dry place away from sunlight. Keep balloon and garland kits sealed until setup day, and handle honeycomb and tissue pieces by their edges.


